Name of ship | : | IKHASAS 2 | Operational Status | : | IN OPERATION | ||
Previous name | : | ||||||
MYCID | : | 16910008 | Official No. | : | 336969 | ||
IMO No. | : | - | Call Sign | : | - | ||
Class Notation | : | A2, MS, E1, FLAT TOP BARGE (DECK CARGO BARGE), SI. | |||||
Flag | : | MALAYSIA | Port of Registry | : | PORT KELANG | ||
Vessel Type : | : | FLAT TOP BARGE (DECK CARGO BARGE) |
Certificate No. | Name of Certificate | Date Issued | Expiry |
---|---|---|---|
240221CC | CC - CERTIFICATES OF CLASSIFICATION | 22 Aug 24 | 31 Oct 29 |
240221SC(NC) | CSSC (NC) - CARGO SHIP SAFETY CONSTRUCTION (NON-CONVENTION) | 22 Aug 24 | 31 Oct 29 |
240221LL | ILL - INTERNATIONAL LOAD LINE (1966) | 22 Aug 24 | 31 Oct 29 |
220018ITC | ITC - INTERNATIONAL TONNAGE (1969) | 25 Feb 22 | - |
Endorsement Type | Due Date | Window (months) |
---|---|---|
Annual Survey #1 | 31 Oct 25 | +3 -3 |
Annual Survey #2 | 31 Oct 26 | +3 -3 |
Intermediate | - | - |
Annual Survey #3 | 31 Oct 27 | +3 -3 |
Annual Survey #4 | 31 Oct 28 | +3 -3 |
Renewal | 31 Oct 29 | -6 |
ID | Survey Type | Due Date | Window (months) |
---|---|---|---|
Load Line | |||
1 | Load Line Annual - No.1 | 31 Oct 25 | +3 -3 |
2 | Load Line Annual - No.2 | 31 Oct 26 | +3 -3 |
3 | Load Line Annual - No.3 | 31 Oct 27 | +3 -3 |
4 | Load Line Annual - No.4 | 31 Oct 28 | +3 -3 |
5 | Load Line Renewal | 31 Oct 29 | -6 |
Safety Construction | |||
6 | Safety Construction Annual - No.1 | 31 Oct 25 | +3 -3 |
7 | Safety Construction Annual - No.2 | 31 Oct 26 | +3 -3 |
8 | Safety Construction Annual - No.3 | 31 Oct 27 | +3 -3 |
9 | Safety Construction Annual - No.4 | 31 Oct 28 | +3 -3 |
10 | Safety Construction Renewal | 31 Oct 29 | -6 |
ID | Class Survey Type | Due Date | Window (months) |
---|---|---|---|
Main Class | |||
1 | Main Class Annual - No.1 | 31 Oct 25 | +3 -3 |
2 | Main Class Annual - No.2 | 31 Oct 26 | +3 -3 |
3 | Main Class Intermediate | - | -6 +6 |
4 | Main Class Annual - No.3 | 31 Oct 27 | +3 -3 |
5 | Main Class Annual - No.4 | 31 Oct 28 | +3 -3 |
6 | Main Class Renewal | 31 Oct 29 | -6 |
Dry Docking | |||
7 | Dry Docking Intermediate | - | +3 -3 |
8 | Dry Docking Renewal | 31 Oct 29 | -6 |
Tail Shaft | |||
9 | Tail Shaft Intermediate | - | +3 -3 |
10 | Tail Shaft Renewal | 31 Oct 29 | -6 |